A practice built
around a laboratory.

Advanced Construction Technologies designs structures, assesses structures that are already standing, and develops the systems used to strengthen and connect them. The three activities feed each other — every system we hold a patent on started as a problem on one of our own sites.

How the office works

Site problem,
laboratory answer,
site again.

Most consultancies stop at the code check. We keep going: when a detail keeps failing on site, it gets built at full scale, instrumented and loaded to failure in a university laboratory, and the result becomes a new detail — then a granted patent, then a system available to the industry.

That is where the mechanical strengthening technique came from, and the rebar coupler, and the truss reinforcement that removed the bend from a corner joint. The test data behind each one is published and can be read in full.

The published test programmes

ACT — Advanced Construction Technologies LTD. A rebar coupler specimen mounted in a universal testing machine during a tension test.
Full-scale specimens are loaded to failure before a system leaves the office.
+0
Years of
practice
+0
Projects
delivered
+0
Patents
granted & filed
+0
Bridges inspected
and redesigned
+0
Countries with
delivered work
+0
Project reviews
completed

Capabilities

What we are
engaged to do.

A

Structural design and site supervision

Complete structural design for malls, towers, factories, hospitals, mosques and housing — from the foundations up, with supervision through construction where the client wants it.

B

Assessment of existing structures

Condition surveys, load capacity assessment and technical reports on buildings, factories, towers and bridges — including structures damaged by fire, settlement, overloading or conflict.

C

Strengthening and repair design

Retrofit schemes using the MST system or conventional methods, designed to be built while the structure stays in use. Includes supervision of the strengthening work itself.

D

Bridges: inspection, assessment, redesign

Detailed inspection and assessment programmes at scale, each bridge with a report setting out strengthening, repair or replacement — plus visual-inspection review of thousands more.

E

Independent design review

Second-opinion review of someone else’s structural design or of an existing scheme before it is built, with a written record of what was checked and what was found.

F

Licensing and joint development

The five ACT systems are available for licensing, manufacture and supervised first application, including the laboratory programme needed to qualify them for a new market.

Where the work has been

Seven countries,
one standard.

Design, assessment and strengthening work delivered in Egypt, Saudi Arabia, Kuwait, Qatar, the United Arab Emirates, Sudan and Djibouti — alongside damage assessment work carried out in Lebanon.

Every project is designed to the code the project is governed by, and every strengthening scheme is designed against a measured capacity rather than an assumed one.

  • Egypt Design · strengthening · assessment
  • Saudi Arabia Bridges · hospitals · assessment
  • Kuwait Towers · condition reports
  • Qatar Palace review · tower piling
  • United Arab Emirates Foundations · shore protection
  • Sudan Bridge foundations
  • Djibouti Housing · planning · design

Start a conversation.

Design, assessment, strengthening, review, or licensing one of the systems.